Projects Progress Update - OCTOBER 2012

    Total No. of projects as at 31/10/2012 58
    Total No. of projects completed in 31/10/2012 23
    Total spend for October 2012 £989,918

    Afghanistan

    No Project Cost of project Start date End date Status No of Beneficiaries
    Afghan Orphans £295,00 01/01/2012 30/11/2012 Ongoing 773

    Each orphan receives an allowance of £25 per month for food, clothing and education.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Afghan Widows £44,428 01/01/2012 30/11/2012 Ongoing 134

    Each widow receives an allowance of £25 per month for their day to day needs.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani 2012 £96,150 01/10/2012 29/10/2012 5000 families
    270 large animals and 500 small animals were sacrificed

    No Project Cost of project Start date End date Status No of Beneficiaries
    Orphan Sponsorship £72,750 Feb. 2012 Jan. 2013 Ongoing 150
    Each orphan receives an allowance of £25 per month for food, clothing and education. This orphan sponsorship scheme is quite unique as part of the critieria is that the orphan has to attend Islamic studies one weekend per month.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani £1,950 01/10/2012 29/10/2012 Completed 180 families
    30 animals were sacrificed

    Bangladesh

    No Project Cost of project Start date End date Status No of Beneficiaries
    1. Orphan Sponsorship £49,934 01/01/2012 30/12/2012 Ongoing 150 Orphans
    The orphan sponsorship project is still going on and so far 150 orphans have received the scholarship money from Jan-12 to December-12 which we have already distributed the scholarship money for September 2012.The scholarship money for October-November will be distributed in the coming month.

    No Project Cost of project Start date End date Status No of Beneficiaries
    2 103 Hand Pumps £15631.00 15/09/12 14/12/12 Ongoing 1,060 families
    No. of wells completed 95 No. of wells remaining 11

    No Project Cost of project Start date End date Status No of Beneficiaries
    3. Qurbani meat distribution during Edul Adha 2012 £16000.00 01/10/2012 29/10/2012 Completed 2000 families
    50 Large, 75 Small were sacrificed

    Burma

    No Project Cost of project Start date End date Status No of Beneficiaries
    Teacher sponsorship £45,000 01/12/2011 30/11/2012 Ongoing 150 teachers

    This is our on-going yearly teacher sponsorship scheme. 150 poor teachers are benefitting from this project.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Orphan sponsorship £48,600 01/01/2012 31/12/2012 Ongoing 150 orphans

    This is our on-going yearly orphan sponsorship scheme. 150 orphans are benefitting from this project.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Orphanage support £6,480 01/01/2012 31/12/2012 Ongoing 182 people

    This is our on-going yearly orphanage support scheme. We are providing food assistance to these 2 poorly funded orphanages.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Water Hand Pump Well £16,500 2012 2013 Ongoing 3720 people
    No. of wells completed No. of wells remaining 124
    Work on 124 new hand pumps has commenced.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Medical Projects £9,750 01/04/2012 31/12/2012 Ongoing 50 patients
    50 patients wil receive free medical treatment including medicines for any eye related conditions.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Medical Projects £24,339 01/07/2012 31/12/2012 Ongoing 137 patients
    137 pateints will be receiving free general treatment including medicines.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Arkan Rohingya Refugees project £20,000 05/08/2012 25/10/2012 Completed 1289 families

    Cash payments of £15 per family were given to the Rohingya refugees

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani £64,373 10/10/2012 10/11/2012 Completed 16800 families
    A total of 280 large animals were sacrificed of which 100 large animals were sacrificed in the Rohingya refugee camps in Arkan state.

    Chechnya

    No Project Cost of project Start date End date Status No of Beneficiaries
    Orphan Sponsorship £32,896 01/01/2012 31/12/2012 Ongoing 100 orphans
    Each orphan receives an allowance of £25 per month for food, clothing and education.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Widows Income Generating Project £19,464 01/05/2012 30/11/2012 Ongoing 13 widows
    • In October 2012, one small business project for dry-cleaning of furniture and carpets has been launched in stanitsa Pervomayskaya of the Groznenskiy district of Chechnya (beneficiary: Isaeva Zalina).


    • Cattle breeding project: program staff procured 2 bulls, hay and fodder for project implementation in Dargo settlement of the Vedensky district, Chechnya (beneficiary: Ehirat Tovsultanova).


    • Cattle breeding project: program staff aslo procured 2 bulls, hay and fodder for project implementatio in Goyty settlement of Chechnya (beneficiary: Hadizhat Daudova).

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani £6,815 10/10/2012 10/11/2012 Completed 367 families
    6 large animals were sacrificed and meat was distributed among poor families in temporary accommodation centre (TAC) in Stanitsa Assinovskaya of the Sunzhenskiy district, four TACs in Grozny, as well as orphans living both in Grozny and Grozny rural.

    Gambia / Senegal

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani / Gambia £3,080 26/10/2012 31/10/2012 Completed 510 Families
    Qurbani / Senegal £4,140 26/10/2012 31/10/2012 Completed 776 Families
    Gambia - 10 small and 10 large animals sacrificed.
    Senegal - 30 small and 6 large animals sacrificed.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Flood relief (Gambia) £10200 20 Oct 12 15 Nov 12 Ongoing 500

    500 food packs to be delivered to 500 families

    No Project Cost of project Start date End date Status No of Beneficiaries
    Annula Food Aid (Gambia) £10500 20 Oct 12 15 Nov 12 Pending 520 Families
    600 Children

    Project was delayed due to the recent floods experienced in Gambia.


    520 food packages will be distributed to the extreme poor families.
    Will be providing 1 meal per day for 3 months to 600 children in Madrasa's.

    Haiti

    No Project Cost of project Start date End date Status No of Beneficiaries
    Fencing, Masjid and Well for Darul Uloom Haiti GBP
    33,253.55
    01/02/2012 31/10/2012 Completed 550

    Following on from the emergency situation in Haiti, UWT teamed up with Darul Ul Loom Trinidad to construct a Masjid for the local people. This Masjid complex is now a focal point of the community and has a number of activities taking place. There have been many people who have reverted to Islam through this project.

    India

    No Project Cost of project Start date End date Status No of Beneficiaries
    2. India Hifz sponsorship Rajasthan £18,500 01/01/2012 31/12/2012 ONGOING 100 Hifz Students
    3. India Hifz sponsorship
    Sufibuag, Surat
    £15,000 01/09/2012 30/08/2013 ONGOING 100 Hifz Students
    3. India Alim sponsorship
    Sufibuag, Surat.
    £9,000 01/09/2012 30/08/2013 ONGOING 50 Alim Students

    No Project Cost of project Start date End date Status No of Beneficiaries
    4. India Orphans
    Rajasthan
    £15,000 01/07/2012 30/06/2013 ONGOING 50 orphans
    Each orphan receives an allowance of £25 per month for food, clothing and education.

    No Project Cost of project Start date End date Status No of Beneficiaries
    5. Qurbani Project - 2012 £137,950 17/09/2012 30/10/2012 Completed 27350 families
    Sundarban - 1730 large animals were sacrificed
    Assam - 200 large animals were sacrificed.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Hand Pumps £15631.00 15/09/12 14/12/12 Ongoing 1,060 families
    No. of wells completed 227 No. of wells remaining 27
    The hand pumps project as being run which is nearing completion

    No Project Cost of project Start date End date Status No of Beneficiaries
    Masjid Construction £12,500 01/06/2012 25/10/2012 Completed 1500 people
    No. of Masjids completed 1 No. of Masjids planned 2

    No Project Cost of project Start date End date Status No of Beneficiaries
    Cataract programme £4,220 10/06/2012 30/11/2012 Ongoing 100 people
    No. of operations undertaken 65 No. of operations remaining 35


    Iraq

    No Project Cost of project Start date End date Status No of Beneficiaries
    Orphan Sponsorship £68,400 01/01/2012 31/12/2012 Ongoing 150 Orphans

    Each orphan receives an allowance of £35 per month for food, clothing and education.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Widow Sponsorship £46,000 01/01/2012 31/12/2012 Ongoing 50 Widows

    Financial support given to widows. £70 per month given to meet their day to day living needs.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani 2012 £5,650 12/09/2012 15/11/2012 Completed 350 Families
    10 small animals and 3 large animals were sacrifiiced.

    Kashmir

    No Project Cost of project Start date End date Status No of Beneficiaries
    Kashmir Orphans £69,313 01/01/2012
    30/11/2012
    Ongoing 250

    Each orphan receives an allowance of £25 per month for food, clothing and education.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Kashmir Widows £44,098 01/01/2012 30/11/2012 Ongoing 133

    Each widow receives an allowance of £25 per month for their day to day needs.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Kashmir Masjid £13,000 10/03/2012 Ongoing 300 people

    Construction work of the Masjid in Kashmir is started.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani £51,750 26/10/2012 30/10/2012 Completed 4000 families

    250 small animals and 150 large animals were sacrificed.

    Kenya

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani £14,850 26/10/2012 30/10/2012 Completed 3100 families
    171 small animals and 81 large animals were sacrificed.

    Malawi

    No Project Cost of project Start date End date Status No of Beneficiaries
    Somba Medical clinic £22,500 01/05/2012 30/04/2013 Ongoing 125 patients per day

    Medical clinic provides free medical care to hundreds of people within a 70km radius.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani Project
    £25,950
    26/10/2012
    30/10/2012 Completed
    865 families
    865 small animals were sacrificed

    Pakistan

    No Project Cost of project Start date End date Status No of Beneficiaries
    Ummah Children Academy Orphans
    £205,996
    01/01/2012
    31/11/2012 Ongoing
    804 orphans

    The 804 orphans reside at the Ummah Children Academy where they receive both secular and Islamic education. All their needs are catered by the UCA.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Pakistan Orphans
    £205,996
    01/01/2012
    31/11/2012 Ongoing
    739

    Each orphan receives an allowance of £25 per month for food, clothing and education.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Pakistan Widows
    £28,350
    01/01/2012
    31/11/2012 Ongoing
    84

    Each widow receives an allowance of £30 per month for their day to day needs.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Wells / Hand Pumps
    £163,800
    01/03/2012
    15/02/2013 Ongoing
    14000 families
    No. of wells completed 157 No. of wells remaining 98

    No Project Cost of project Start date End date Status No of Beneficiaries
    Masjid Construction £208,029 10/09/2011 10/03/2012 Ongoing 8500
    No. of Masjids completed 18 No. of Masjids remaining 16

    Masajids are bulit in the most neediest of areas, KPK, Sindh and Punjab provinces. Many Masajids were built in the flood affected areas.

    No Project Cost of project Start date End date Status No of Beneficiaries
    House construction
    £500,000
    15th Oct 2011
    15th Oct 2012
    Ongoing
    250 families
    No. of Houses completed 200 No. of Houses remaining 50

    Phase II housing project for the flood victims of sindh.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Blood Bank
    £1,715
    01/01/2012
    31/12/2012
    Ongoing
    200 patients

    No. of patients receiving treatment

    200

    The blood bank is operation since 3 September 2009 and is providing blood to the needy patients free of cost. So far hundreds of patients have been benefited from this blood bank. The blood bank is supported by a huge number of blood donors in the area

    No Project Cost of project Start date End date Status No of Beneficiaries
    Dialysis treatment
    £22,404
    01/07/2012
    31/12/2012
    Ongoing
    900 people
    No. of patients receiving treatment No. of dialysis undertaken
    154

    On a daily basis, about 6 dialysis sessions are being carried out for the most vulnerable patients. We have recently purchased a new dialysis machine, which will increase the number of dialysis sessions to 200 per month

    No Project Cost of project Start date End date Status No of Beneficiaries
    Ummah Vocational & Rehabilitation Centre
    £41,569
    01/01/2012
    31/12/2012
    Ongoing
    53 disabled students

    This is a unique project where by 53 disabled children reside at the centre and are being provided with the following activities

    • Quality Education & Moral Appreciation.
    • Quran & Religious Knowledge.
    • Food in accordance with good standard & balance diet.
    • Extracurricular activities for mental & physical growth.

    No Project Cost of project Start date End date Status No of Beneficiaries
    1 WANA UCA
    £23,345
    01/03/2012
    28/02/2012 Ongoing
    350 orphans

    This orphan sponsorship scheme primarily concentrates on education, both Islamic and secular in the South Waziristan Agency.

    No Project Cost of project Start date End date Status No of Beneficiaries
    1 New Muslim Scholarship project
    £5,270
    01/07/2012
    31/12/2012 Ongoing
    100 students

    This is a unique project following on from our very successful Slavery to Freedom project. This project will provide each child of a the new Muslim families with £10 per month towards their Secular and Islamic education.

    No Project Cost of project Start date End date Status No of Beneficiaries
    1 Educational Aid & Support Project (Wana) £5,270
    01/10/2012
    30/09/2013 Ongoing
    1700 students

    The purpose of intervention of this project is to extend its support to poor students of South Waziristan Agency, who without this support will not be able to access mainstream education.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani 2012
    £481,540
    23/10/2012
    31/10/2012 Completed
    37,214 Families

    1966 small animals and 1484 small animals were sacrificed.

    Palestine

    No Project Cost of project Start date End date Status No of Beneficiaries
    1 ORSP 2012/2013
    £163,000
    01/04/2012
    30/03/2013 Ongoing
    500 orphans

    No Project Cost of project Start date End date Status No of Beneficiaries
    Medical Equipment
    £82,425
    10/05/2011
    30/12/2012 Ongoing
    1000 patients

    No Project Cost of project Start date End date Status No of Beneficiaries
    Tahfeezul Quran 2012
    £21,500
    01/02/2012
    30/11/2012 Ongoing
    100 students
    No of children attending 100 No. of teachers 10

    Hifz sponsorship is £15 per month and Teacher sponsorship is £65 per month.

    No Project Cost of project Start date End date Status No of Beneficiaries
    House construciton
    £25,000
    01/05/2011
    30/10/2012 Completed
    6 Families
    No. of Houses completed 6 No. of houses remaining 0

    This project reconstructed 6 houses for the neediest and deserving families in Gaza.

    No Project Cost of project Start date End date Status No of Beneficiaries
    1 Finshing Masjid in Gaza
    £3,568
    01/07/2012
    15/10/2012 Completed
    500 prayers
    Ummah Welfare Trust supports local communities in the Gaza strip who do not have sufficeint funds to complete the construction of Masjids

    No Project Cost of project Start date End date Status No of Beneficiaries
    Food Voucher Project 2012
    £ 39,500
    01/03/2012
    30/12/2011 Ongoing
    150 families

    Each of the 150 families receives a £25 food voucher every month. They then purchase their day to day needs from selected supermarkets.

    No Project Cost of project Start date End date Status No of Beneficiaries
    School Kits Project
    £5,000
    15/09/2012
    31/10/2012 Delayed
    500 children

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani Project for the year 2012
    £26,100
    01/10/2012
    31/10/2012 Completed
    1736 families

    45 small animals and 11 large animals were sacrificed

    Philippines

    No Project Cost of project Start date End date Status No of Beneficiaries
    57 Tricycle Rickshaws
    £10,638
    12/05/2012

    31/10/2012 Completed
    57 families

    This is an income generating project which allows the benficiaries to ear their own living and become self sufficient.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Orphan sponsorship
    £17,400
    20-10-011
    20-10-2012 Ongoing
    50 Orphans

    50 orphans receive a monthly allowance of £25 per month which will cover their monthly living expenses.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Housing Repair
    £4,672
    01/09/2012
    31/10/2012 Completed
    10 Families

    No Project Cost of project Start date End date Status No of Beneficiaries
    55 Wells / Hand Pumps
    £23431.64
    May 15 2012
    Sept 30 2012 Delayed
    8000
    No. of wells completed 53 No. of wells remaining 2

    Completion of wells has been delayed due to the rain season

    No Project Cost of project Start date End date Status No of Beneficiaries
    Typhoon victims
    £8,521
    23/10/2012
    15/11/2012 Ongoing
    15 Families

    Following on from the recent Typhoons which hit the coast of Philippines, we initiated our emergency programme and will repair 15 houses which were damaged and provide emergency food packs to 20 families.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani 2012
    £1,200
    23/10/2012
    31/10/2012 Completed
    200 Families
    15 small animals were sacrificed

    Somalia

    No Project Cost of project Start date End date Status No of Beneficiaries
    IGP - Goats
    £33,810
    ................ ............... delayed
    200 families

    Project start date has been delayed due to security concerns. Each family will receive 5 goats as part of the income generating project.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Water Tanker x 3
    £30,000
    19/6/2012
    ............... Ongoing
    No. of Water Tankers 3 Litres of water distributed per day 117,600 litres

    This project is one of the most appreciated projects, for the internally displaced persons in Mogadishu as it is their daily running water, as long as dry seasons are beginning this project is indispensable.

    No Project Cost of project Start date End date Status No of Beneficiaries
    1 Wells £67,434 18/7/2012 Ongoing
    No. of wells completed 03 No. of wells started
    03

    Due to the heavy conflict in the region, Ummah Welfare Trust took the decision to suspend its well projects temporarily as we did not want to place any of our staff members at risk. The project is operational as the conflict has subsided.

    No Project Cost of project Start date End date Status No of Beneficiaries
    1
    Orphans / Orphange

    £105,000
    01/12/2011
    30/11/2012
    Ongoing
    350

    There are 350 orphans (boys and girls) who reside in the orphange in Baidoa. Monthly cost is £25 per month for each orphan, which covers all there day to day costs.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Biadoa Medical Clinic
    £2000 per month
    01/09/2012
    31/11/2012

    Ongoing 1050 patients per month
    No. of patients receiving treatment / day
    35 patients a day

    No Project Cost of project Start date End date Status No of Beneficiaries
    1 Masjid Construction
    £23,855
    01/07/2012
    31/12/2012
    Ongoing
    No. of Masjids completed 0 No. of Masjids remaining 2

    Masjid construction was delayed due to the on-going conflict. Construction work has now resumed.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani Project
    £50,500
    26/10/2012
    29/10/2012 Completed
    520 families

    1010 small animals were sacrificed

    Sudan

    No Project Cost of project Start date End date Status No of Beneficiaries

    Orphan Sponsorship

    £22,500
    Mar 2012
    Feb 2013 Ongoing
    75

    Each orphan receives an allowance of £25 per month for food, clothing and education.

    No Project Cost of project Start date End date Status No of Beneficiaries
    Qurbani Project

    £5,172
    26/10/2012
    29/10/2012 Completed
    520 families

    11 small animals and 15 large animals were sacrificed