UCA Construction Update - March 2009

    Progress Report of Construction

    Tuftiles and Curbstones:
    The work on tuftiles and curbstone for the footpath in front of junior academic block & teacher residence is completed.

    The tuftile work is in progress in front of Student Hostel II and Kitchen as shown below:

    Before the teacher residence the rockwall work is completed in junior academic block and Hostel I and Hostel II. Now, as teacher residence is ready for rockwall. So, the rockwall work is under progress in the teacher residence as shown in the picture:

    Senior Academic Block:
    In the senior academic block, the work on the layout, digging and foundation is completed while column steel work is in progress as shown below:

    Masjid progress:

    During the month of March, the filling of foundation site of walls and bricks work in the basement is completed while the shattering work is in progress as shown below:

    In Hostel One, all the construction and tiles work is completed and also the grill work is completed which was remained in the month of February 2009, as shown in the picture.

    Administration Block:
    The work on the layout of administration block is started as shown below:

    Gardening in the main entrance of UCA is in progress as shown below:

    Repainting of the Junior Academic Block is in progress as shown below:

    A tile work is in progress in the academic block as shown below:

    Teacher Residence
    Grinding of floor is in the progress in the medical ward as shown in the picture.

    Junior Academic Block (complete)

    Student Hostel II (complete)

    Written by:
    Ummah Welfare Trust (Pakistan)